一品楼凤楼论坛最新消息,武汉品茶Q群联系方式,珠海约茶联系方式

上海金泰工程机械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

Shanghai Jintai Presenting the largest width hydraulic diaphragm wall grab with 1.5m in China

2009-02-23

    At present, SG 40A hydraulic diaphragm wall grab made by Shanghai Jintai struts its stuff during the construction of Changjiang tunnel of Wuhan subway line 2. The grab with 1.5m width and 2100L volume is the largest in China and finished 1.5m width and 48m depth notch within 13 hours, which created new record in width formation and construction efficiency of diaphragm wall construction.


 


    The Changjiang tunnel project of Wuhan subway line 2 is complex in geological situation with upper soft layer and lower rigid layer. The backfill soil layer and clay layer are between 1m and 15m under ground, sand layer is 16m—48m under ground and cobble and sand layers are 48m under ground. The tunnel project has very high construction requirement, for example, even if the foreign machine is used, the high cost and low efficiency will be incurred. But the 1.5m hydraulic diaphragm wall grab made by Jintai has solved such problem and won the good praise from the customers.

    The successful presence of SG 1500 hydraulic diaphragm wall grab indicates that Shanghai Jintai has stepped further, which reduces the cost, provides the important guarantee to the country’s infrastructure construction and has profound meaning to piling machinery industry in our country.

主站蜘蛛池模板: 正定县| 从江县| 余庆县| 湖南省| 贵州省| 汕头市| 阜南县| 山东| 绥芬河市| 伊金霍洛旗| 南皮县| 新邵县| 黎平县| 建水县| 汶上县| 揭东县| 达州市| 江孜县| 沐川县| 林芝县| 汝南县| 濮阳县| 襄樊市| 遂川县| 芜湖市| 延津县| 蒙城县| 千阳县| 城口县| 武穴市| 吉木乃县| 吴堡县| 伊春市| 西安市| 青州市| 岳池县| 沾益县| 宣武区| 建阳市| 普兰县| 广河县|