一品楼凤楼论坛最新消息,武汉品茶Q群联系方式,珠海约茶联系方式

上海金泰工程机械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

Jintai machine constructed in Egypt

2009-11-10

    The second stage project of Said port Egypt is located in the north of Suez Canal. This project is to make a dock with the square piles in the middle part and T type piles in the circumjacent part. The dock will be the berth for 4 Panama super-type container ships. This project is the key project in Egypt.


 


    We have 7 sets of Jintai machines constructed in Said port as the main force, including 3 sets of SG40A, 1 set of SG35A, 2 sets of SD28W rotary drill and 1 set of SMW ZKD85-3.
The stratum condition: 0-13m sand layer, 13-15m fill-back layer, 15-45m soil layer, 45-57m fine sand layer.


 


    JINTAI machines are praised by the user and Egypt supervisor with good performance.

主站蜘蛛池模板: 邹城市| 京山县| 武川县| 定边县| 绥滨县| 百色市| 兴安县| 霍山县| 探索| 柳林县| 靖州| 延安市| 始兴县| 沙田区| 龙州县| 承德市| 颍上县| 黔南| 星座| 新疆| 吉木萨尔县| 宽城| 南阳市| 灵宝市| 灵丘县| 河西区| 筠连县| 平湖市| 昌江| 曲靖市| 依兰县| 盈江县| 宣城市| 景德镇市| 津南区| 达州市| 鸡西市| 盐亭县| 孝义市| 海宁市| 石首市|