一品楼凤楼论坛最新消息,武汉品茶Q群联系方式,珠海约茶联系方式

上海金泰工程机械有限公司
上海安亭洛浦路45号 400-820-8326

NEWS

Jintai machine constructed in Egypt

2009-11-10

    The second stage project of Said port Egypt is located in the north of Suez Canal. This project is to make a dock with the square piles in the middle part and T type piles in the circumjacent part. The dock will be the berth for 4 Panama super-type container ships. This project is the key project in Egypt.


 


    We have 7 sets of Jintai machines constructed in Said port as the main force, including 3 sets of SG40A, 1 set of SG35A, 2 sets of SD28W rotary drill and 1 set of SMW ZKD85-3.
The stratum condition: 0-13m sand layer, 13-15m fill-back layer, 15-45m soil layer, 45-57m fine sand layer.


 


    JINTAI machines are praised by the user and Egypt supervisor with good performance.

主站蜘蛛池模板: 昭觉县| 龙南县| 维西| 繁峙县| 肥乡县| 亚东县| 隆德县| 博湖县| 漳浦县| 疏勒县| 依安县| 五家渠市| 贡觉县| 梁山县| 南靖县| 望城县| 新余市| 峨眉山市| 克什克腾旗| 武功县| 修文县| 云浮市| 嘉鱼县| 丹江口市| 乐陵市| 凉山| 新邵县| 惠来县| 大荔县| 钟山县| 焉耆| 黎川县| 华宁县| 神池县| 辽阳县| 景泰县| 湘乡市| 吴旗县| 罗江县| 镇原县| 成武县|